|
Techniques 1
[ phase 4 ] Smoothing
Dealing with mosaic floors in lime, the drying process requires
around thirty days. After this time the smoothing procedure
follows. Subsequently, the linseed oil is applied once the
floor
is dry, and finally after a short period of time the refinement
and shining (with wax or lead) procedure takes place. <<

|